HeNan HaiHeng Import and Export Co.,Ltd
|
Price: | 15000.0~16000.0 USD |
Payment Terms: | T/T,L/C,WU |
Place of Origin: | Henan, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
3 axle 40ft Flatbed semi-trailer | ||||
No | ITEM | Unit | Quantity | MODEL |
1 | Axle | piece | 3 | FUWA-13T |
2 | tyre | piece | 12 | 1100R20 Radial TYRE |
3 | rim | piece | 12 | 8.0-20 |
4 | suspension | Set | 1 | CIMC HUAJUN Suspension |
5 | leaf-sping | Set | 6 | 90width*10pieces*13 thickness |
6 | Kingpin | piece | 1 | 2" bolted type.JOST |
7 | landing gear | set | 1 | JOST D200 |
8 | braking system | emergency relay valve | 1 | WABCO |
Air reservoir | 2 | 50L | ||
Double braking chamber | 2 | 30/30 spring brake chamber on front axle | ||
Single braking chamber | 2 | 30,brake chamber on rear axle | ||
Tie-in | 1 | haldex | ||
9 | electricalsystem | set | 1 | 24 volt electrical system.7 pin electrical connector.parking.stop,reverse,number plate and indicator lights.rear lights conform to Europeanstandard,rear front and side reflectors |
Main Specification of Trailer | ||||
NO | specification | numerical value | ||
1 | overall dimension(L*W*H) | 12380*2500*1450 | ||
2 | Wheelbase(Mm) | 1310 | ||
3 | G.V.W(kg) | 7200 | ||
4 | Rated Payload( kg) | 40000 | ||
5 | main material of the trailerand manufacturetechnology | MAIN MATERIAL OF THE CHASSIS, MAIN BEAM, Q345 CARBON STEEL/ CROSSBEAM, Q235 CARBON STEEL(square pipe steel) | ||
MAIN MANUFACTURE TECHNOLOGY USING TECHNOLOGY OF BLASTING AND PAINT THEEPOXY ZINC RICH PRIMER TO DEAL WITH THE SURFACE OF RAW MATERIAL AND THE COMPLETEVEHICLES | ||||
6 | the mainbeam of the semi-trailer | UPPER & LOWER WING-PLATE (MM) THICKNESS, UPPER, 14 MM LOWER, 16MM MATERIAL, Q345 CARBON STEEL | ||
MAIN BEAM (MM)THICKNESS,8MM MATERIAL, Q345 CARBON STEEL HEIGHT OFTHE BEAM, 500MMNUMBERS, 2 SETS MAIN MANUFACTURE TECHNOLOGY USING HIDDENARC WELDING TO WELD THE MAIN BEAM USING GRIP BLASTING AND THE EPOXY ZINCRICH PRIMER TO DEAL WITH THE SURFACE OF THE BEAM | ||||
7 | painting system | THE STEEL OF THE VEHICLES COME TO THE GRADE SA2.5 AFTER BLAST.THREE LAYS FORTHE PAINT, COLOR, DEPENDING ON THE CUSTOMER | ||
8 | payment terms | 30% TT in advance,the balance should be paid 10 days prior to the deliverytime | ||
9 | delivery date | 20 days after the deposit and the confirmation of the drawing. | ||
10 | FOB CHINA Port |